Hacker News
new
|
past
|
comments
|
ask
|
show
|
jobs
|
submit
login
jpadkins
on Dec 4, 2013
|
parent
|
context
|
favorite
| on:
Sheerwind
Right, but is the mfging and installation costs of the 90m blade vs. the structure of the same size?
I see this as a cost optimization, not a way to get more energy from the same source.
Guidelines
|
FAQ
|
Lists
|
API
|
Security
|
Legal
|
Apply to YC
|
Contact
Search:
I see this as a cost optimization, not a way to get more energy from the same source.